Blast furnace gas turbine power generation system capable of realizing TRT load distribution
The utility model provides a blast furnace gas turbine power generation system capable of realizing TRT load distribution, which mainly solves the technical problem that the TRT load of each blast furnace is not effectively distributed because one TRT of two or more blast furnaces operates in a high...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model provides a blast furnace gas turbine power generation system capable of realizing TRT load distribution, which mainly solves the technical problem that the TRT load of each blast furnace is not effectively distributed because one TRT of two or more blast furnaces operates in a high-load working condition for a long time and the other TRT operates in a safe working condition range for a long time. The power generation system comprises N blast furnaces and N TRTs, and N is a positive integer and is larger than or equal to 2; an inlet pipeline and an outlet pipeline are respectively arranged on two sides of the TRT device; each TRT device in the N TRT devices is connected with the other TRT devices in pairs through gas distribution pipelines, the gas distribution pipelines are connected to inlet pipelines of every two TRT devices, the gas distribution pipelines are further provided with adjusting valves and differential pressure transmitters, and the two ends of each differential pressure trans |
---|