Hanging and buckling combined cable crane tower frame

The utility model provides a hoisting and buckling combined cable crane tower frame which comprises a transition pier, a buckling tower, a crane tower and a cable rope. The transition pier is built on a skewback foundation of a bridge in a pouring mode, and an embedded part is arranged in a bent cap...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LIU MIAO, YANG TENG, CHENG XUZHAO, ZHOU CHEN, NIE CHANGYONG, MA GONGCHEN, YIN MINGCHANG, MA DONGDONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The utility model provides a hoisting and buckling combined cable crane tower frame which comprises a transition pier, a buckling tower, a crane tower and a cable rope. The transition pier is built on a skewback foundation of a bridge in a pouring mode, and an embedded part is arranged in a bent cap of the transition pier. The lower end of the buckling tower is connected with an embedded part on the top of the transition pier in a welded mode. The lower end of the tower crane is hinged to the upper end of the buckling tower, a tower top main beam is arranged at the upper end of the tower crane, and a plurality of cable ropes are arranged between the two ends of the tower top main beam and the ground. 本实用新型提供一种吊扣合一的缆索吊塔架,包括:过渡墩、扣塔、吊塔和缆风绳;所述过渡墩浇筑建立在桥梁的拱座基础上,所述过渡墩的盖梁内设置有预埋件;所述扣塔的下端与所述过渡墩顶部的预埋件焊接连接;所述吊塔的下端与所述扣塔的上端相铰接,所述吊塔的上端设置有塔顶主梁,所述塔顶主梁的两端与地面之间设置有多个缆风绳。