Artificial piled mountain vegetation planting structure
A manually piled mountain vegetation planting structure comprises a plant planting part, a planting hole is formed in the bottom of the plant planting part, the planting hole comprises a matrix with the middle sunken downwards, a waterproof layer is embedded in the surface of the matrix, and the pla...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A manually piled mountain vegetation planting structure comprises a plant planting part, a planting hole is formed in the bottom of the plant planting part, the planting hole comprises a matrix with the middle sunken downwards, a waterproof layer is embedded in the surface of the matrix, and the planting hole is filled with regenerated soil; a gravel layer is arranged between the substrate and the regenerated soil; a water collecting tank is arranged on one side of the planting part, an overflow channel penetrating to the native soil layer is arranged at the bottom of the water collecting tank, and the overflow channel is filled with solid waste. According to the manually-piled mountain vegetation planting structure and the construction method thereof, building solid waste and plant solid waste are adopted for preparing regenerated soil, small-scale backfilling reconstruction is carried out, the use amount of soil is reduced, and the waterproof layer is arranged, so that water can be stored, and the situation |
---|