Construction equipment for hanging, integrally splicing and integrally lifting building vertical formworks
The utility model relates to construction equipment for hanging, splicing and lifting a building vertical template, which comprises an I-shaped steel hanging head, I-shaped steel, a pulley hanging point, a turn buckle, a hanging rod and a U-shaped clamping ring, the I-shaped steel is arranged at any...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model relates to construction equipment for hanging, splicing and lifting a building vertical template, which comprises an I-shaped steel hanging head, I-shaped steel, a pulley hanging point, a turn buckle, a hanging rod and a U-shaped clamping ring, the I-shaped steel is arranged at any position of a steel platform through the I-shaped steel hanging head, the pulley hanging point is arranged on the I-shaped steel, and the turn buckle is arranged on the U-shaped clamping ring. The pulley lifting point is connected with the lifting rod through a turn buckle, and the U-shaped clamping ring is arranged at the tail end of the lifting rod and used for being connected with a vertical formwork. The steel bar binding and pouring of the vertical wall body are firstly carried out, the vertical wall body template is lifted along with the steel platform after being demoulded, and then the pouring of the beam plate is carried out. Wherein the template hanging system is flexible in arrangement, is suitable for |
---|