Tunnel primary support double-layer lagging jack positioning device
The utility model relates to the field of buildings, in particular to a tunnel primary support double-layer arch center positioning device. The positioning device comprises a double-mantle-thread door-shaped connecting rib (2), the double-mantle-thread door-shaped connecting rib (2) is welded to the...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model relates to the field of buildings, in particular to a tunnel primary support double-layer arch center positioning device. The positioning device comprises a double-mantle-thread door-shaped connecting rib (2), the double-mantle-thread door-shaped connecting rib (2) is welded to the outer-layer steel arch frame (1), concrete is sprayed on the double-mantle-thread door-shaped connecting rib (2), a limiting plate (4) and a positioning plate (5) are arranged below the double-mantle-thread door-shaped connecting rib (2), and the position between the limiting plate (4) and the positioning plate (5) can contain the upper portion of the inner-layer arch frame I-shaped steel. The method has the beneficial effects that the mounting and positioning precision of the inner-layer lagging jack can be improved, coaxial stress of the inner-layer lagging jack and the outer-layer lagging jack is ensured, the splicing and adjusting time in the construction of the inner-layer lagging jack is shortened, and the c |
---|