Construction waste channel arranged upwards along with floors in multi-story building construction
The utility model discloses a construction waste channel arranged upwards along with floors in multi-storey building construction, a discharge pipe is connected with a discharge pipe, guide plates are hinged in the discharge pipe, first hydraulic cylinders respectively arranged on the discharge pipe...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model discloses a construction waste channel arranged upwards along with floors in multi-storey building construction, a discharge pipe is connected with a discharge pipe, guide plates are hinged in the discharge pipe, first hydraulic cylinders respectively arranged on the discharge pipe are hinged with the corresponding guide plates, and a second hydraulic cylinder is arranged on the discharge pipe. Quantitative plates which are symmetrically matched with each other are hinged to the two side walls, located below the flow guide plate, in the discharging pipe respectively, two symmetrical second hydraulic cylinders arranged on the two sides of the discharging pipe are hinged to the corresponding quantitative plates respectively, and a horizontal baffle is installed on the bottom face of the discharging pipe; connecting plates arranged on the two sides of the front end of the baffle extend out of matching holes in the two side walls of the discharging pipe, and third hydraulic cylinders which are v |
---|