Temporary cable structure of cable-stayed bridge
The utility model discloses a temporary cable structure of a cable-stayed bridge. The temporary cable structure comprises a cable bent tower fixing seat; one end of the temporary inhaul cable is arranged on the cable bent tower fixing seat; the beam end fixing seat is connected with the other end of...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | GUO JUNYA DONG LE'AN WANG SHAOPENG JIA SHUAIBING ZHANG YINGHONG ZHANG JILIN SHAN XIANG MAO HONGJIAN PI SHENG |
description | The utility model discloses a temporary cable structure of a cable-stayed bridge. The temporary cable structure comprises a cable bent tower fixing seat; one end of the temporary inhaul cable is arranged on the cable bent tower fixing seat; the beam end fixing seat is connected with the other end of the temporary inhaul cable, the beam end fixing seat comprises an anchor beam and anchor plates supported at the two ends of the anchor beam, and the other end of the temporary inhaul cable is arranged on the anchor beam and located between the anchor plates at the two ends. According to the temporary cable structure of the cable-stayed bridge, the cable bent tower fixing bases are arranged on the cable bent towers, the beam end fixing bases are arranged on the steel beams, and the temporary inhaul cables are arranged between the cable bent tower fixing bases and the beam end fixing bases, so that on the premise that stress is met, sufficient safety coefficients are provided, the stability of the support is guaran |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN214993090UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN214993090UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN214993090UU3</originalsourceid><addsrcrecordid>eNrjZDAISc0tyC9KLKpUSE5MyklVKC4pKk0uKS1KVchPgwjpFpckVqamKCQVZaakp_IwsKYl5hSn8kJpbgYlN9cQZw_d1IL8-NTigsTk1LzUknhnPyNDE0tLYwNLg9BQY6IUAQDH3iww</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Temporary cable structure of cable-stayed bridge</title><source>esp@cenet</source><creator>GUO JUNYA ; DONG LE'AN ; WANG SHAOPENG ; JIA SHUAIBING ; ZHANG YINGHONG ; ZHANG JILIN ; SHAN XIANG ; MAO HONGJIAN ; PI SHENG</creator><creatorcontrib>GUO JUNYA ; DONG LE'AN ; WANG SHAOPENG ; JIA SHUAIBING ; ZHANG YINGHONG ; ZHANG JILIN ; SHAN XIANG ; MAO HONGJIAN ; PI SHENG</creatorcontrib><description>The utility model discloses a temporary cable structure of a cable-stayed bridge. The temporary cable structure comprises a cable bent tower fixing seat; one end of the temporary inhaul cable is arranged on the cable bent tower fixing seat; the beam end fixing seat is connected with the other end of the temporary inhaul cable, the beam end fixing seat comprises an anchor beam and anchor plates supported at the two ends of the anchor beam, and the other end of the temporary inhaul cable is arranged on the anchor beam and located between the anchor plates at the two ends. According to the temporary cable structure of the cable-stayed bridge, the cable bent tower fixing bases are arranged on the cable bent towers, the beam end fixing bases are arranged on the steel beams, and the temporary inhaul cables are arranged between the cable bent tower fixing bases and the beam end fixing bases, so that on the premise that stress is met, sufficient safety coefficients are provided, the stability of the support is guaran</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20211203&DB=EPODOC&CC=CN&NR=214993090U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76516</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20211203&DB=EPODOC&CC=CN&NR=214993090U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>GUO JUNYA</creatorcontrib><creatorcontrib>DONG LE'AN</creatorcontrib><creatorcontrib>WANG SHAOPENG</creatorcontrib><creatorcontrib>JIA SHUAIBING</creatorcontrib><creatorcontrib>ZHANG YINGHONG</creatorcontrib><creatorcontrib>ZHANG JILIN</creatorcontrib><creatorcontrib>SHAN XIANG</creatorcontrib><creatorcontrib>MAO HONGJIAN</creatorcontrib><creatorcontrib>PI SHENG</creatorcontrib><title>Temporary cable structure of cable-stayed bridge</title><description>The utility model discloses a temporary cable structure of a cable-stayed bridge. The temporary cable structure comprises a cable bent tower fixing seat; one end of the temporary inhaul cable is arranged on the cable bent tower fixing seat; the beam end fixing seat is connected with the other end of the temporary inhaul cable, the beam end fixing seat comprises an anchor beam and anchor plates supported at the two ends of the anchor beam, and the other end of the temporary inhaul cable is arranged on the anchor beam and located between the anchor plates at the two ends. According to the temporary cable structure of the cable-stayed bridge, the cable bent tower fixing bases are arranged on the cable bent towers, the beam end fixing bases are arranged on the steel beams, and the temporary inhaul cables are arranged between the cable bent tower fixing bases and the beam end fixing bases, so that on the premise that stress is met, sufficient safety coefficients are provided, the stability of the support is guaran</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDAISc0tyC9KLKpUSE5MyklVKC4pKk0uKS1KVchPgwjpFpckVqamKCQVZaakp_IwsKYl5hSn8kJpbgYlN9cQZw_d1IL8-NTigsTk1LzUknhnPyNDE0tLYwNLg9BQY6IUAQDH3iww</recordid><startdate>20211203</startdate><enddate>20211203</enddate><creator>GUO JUNYA</creator><creator>DONG LE'AN</creator><creator>WANG SHAOPENG</creator><creator>JIA SHUAIBING</creator><creator>ZHANG YINGHONG</creator><creator>ZHANG JILIN</creator><creator>SHAN XIANG</creator><creator>MAO HONGJIAN</creator><creator>PI SHENG</creator><scope>EVB</scope></search><sort><creationdate>20211203</creationdate><title>Temporary cable structure of cable-stayed bridge</title><author>GUO JUNYA ; DONG LE'AN ; WANG SHAOPENG ; JIA SHUAIBING ; ZHANG YINGHONG ; ZHANG JILIN ; SHAN XIANG ; MAO HONGJIAN ; PI SHENG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN214993090UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2021</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>GUO JUNYA</creatorcontrib><creatorcontrib>DONG LE'AN</creatorcontrib><creatorcontrib>WANG SHAOPENG</creatorcontrib><creatorcontrib>JIA SHUAIBING</creatorcontrib><creatorcontrib>ZHANG YINGHONG</creatorcontrib><creatorcontrib>ZHANG JILIN</creatorcontrib><creatorcontrib>SHAN XIANG</creatorcontrib><creatorcontrib>MAO HONGJIAN</creatorcontrib><creatorcontrib>PI SHENG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>GUO JUNYA</au><au>DONG LE'AN</au><au>WANG SHAOPENG</au><au>JIA SHUAIBING</au><au>ZHANG YINGHONG</au><au>ZHANG JILIN</au><au>SHAN XIANG</au><au>MAO HONGJIAN</au><au>PI SHENG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Temporary cable structure of cable-stayed bridge</title><date>2021-12-03</date><risdate>2021</risdate><abstract>The utility model discloses a temporary cable structure of a cable-stayed bridge. The temporary cable structure comprises a cable bent tower fixing seat; one end of the temporary inhaul cable is arranged on the cable bent tower fixing seat; the beam end fixing seat is connected with the other end of the temporary inhaul cable, the beam end fixing seat comprises an anchor beam and anchor plates supported at the two ends of the anchor beam, and the other end of the temporary inhaul cable is arranged on the anchor beam and located between the anchor plates at the two ends. According to the temporary cable structure of the cable-stayed bridge, the cable bent tower fixing bases are arranged on the cable bent towers, the beam end fixing bases are arranged on the steel beams, and the temporary inhaul cables are arranged between the cable bent tower fixing bases and the beam end fixing bases, so that on the premise that stress is met, sufficient safety coefficients are provided, the stability of the support is guaran</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN214993090UU |
source | esp@cenet |
subjects | ASSEMBLY OF BRIDGES CONSTRUCTION OF BRIDGES CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES FIXED CONSTRUCTIONS OR VIADUCTS |
title | Temporary cable structure of cable-stayed bridge |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-16T22%3A42%3A36IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=GUO%20JUNYA&rft.date=2021-12-03&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN214993090UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |