Rapid plugging tool for bridge cast-in-place box girder slab reserved manhole

The utility model provides a quick plugging tool for a beam plate reserved manhole of a bridge cast-in-place box beam. The quick plugging tool comprises a first clamping plate, the second clamping plate is arranged below the first clamping plate, and a clamping cavity is formed by the second clampin...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: GONG JIEMEI, SU LINQUAN, LIAO KE, HU QIANGBO, ZHONG FUXIANG, CAI XIHU, XIE DESONG, REN WEI, YE CHANGQING, SUN QIANLONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The utility model provides a quick plugging tool for a beam plate reserved manhole of a bridge cast-in-place box beam. The quick plugging tool comprises a first clamping plate, the second clamping plate is arranged below the first clamping plate, and a clamping cavity is formed by the second clamping plate and the first clamping plate; and a plurality of original reserved threaded steel bars are arranged on the clamping cavity in an inserted mode. The technical problem that in the prior art, the blocking progress of the reserved manhole of the beam plate is slow is solved. 本实用新型提供了一种桥梁现浇箱梁梁板预留人孔快速封堵工装,包括有第一夹紧板;第二夹紧板,所述第二夹紧板设置在所述第一夹紧板的下方并与所述第一夹紧板形成夹紧空腔;以及原预留车丝钢筋,多根所述原预留车丝钢筋插设在夹紧空腔上。本实用新型以解决相关技术中梁板预留人孔封堵进度缓慢的技术问题。