Project cost consultation management progress monitoring device

The utility model discloses a project cost consultation management progress monitoring device, and belongs to the technical field of monitoring. The engineering cost consultation management progress monitoring device comprises an installation shell, a swing monitoring mechanism arranged in the insta...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LI XUEBO, LI LINRU
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The utility model discloses a project cost consultation management progress monitoring device, and belongs to the technical field of monitoring. The engineering cost consultation management progress monitoring device comprises an installation shell, a swing monitoring mechanism arranged in the installation shell and a wiping mechanism arranged outside the installation shell, and a through hole matched with the swing monitoring mechanism is horizontally formed in the installation shell. The electric push rod pushes the arcshaped wiping plate to move downwards and abut against the camera, the first motor is started and drives the second rotating shaft to rotate, the second rotating shaft drives the camera to rotate through the second bevel gear, the first bevel gear and the first rotating shaft, and the rotating camera is matched with the arcshaped wiping plate so that dust on the camera can be wiped away. 本实用新型公开了工程造价咨询管理进度监控装置,属于监控技术领域。工程造价咨询管理进度监控装置,包括:安装壳、设置于安装壳内的摇摆监控机构、设置于安装壳外部的擦拭机构,安装壳上水平开设有与摇摆监控机构配合的贯穿孔,