Multi-specialized-pipeline same-groove excavation construction structure
The utility model relates to the technical field of pipeline burying construction, and discloses a multi-specialty pipeline same-groove excavation construction structure which comprises a groove formed in a road surface in an excavation mode, supporting structures fixed to the two sides of the groov...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model relates to the technical field of pipeline burying construction, and discloses a multi-specialty pipeline same-groove excavation construction structure which comprises a groove formed in a road surface in an excavation mode, supporting structures fixed to the two sides of the groove and a pipeline frame installed in the groove, and the supporting structures prevent the groove from collapsing. The pipeline frame is provided with two lower through holes, the two lower through holes are located in the lower portion of the pipeline frame, the rainwater pipeline and the sewage pipeline are arranged in the two lower through holes in a penetrating mode respectively, the pipeline frame is provided with three upper through holes, the three upper through holes are located in the upper portion of the pipeline frame, and the power pipeline, the gas pipeline and the communication pipeline penetrate through the three upper through holes respectively. The pipeline frame is installedin the groove, the rainw |
---|