Construction foot protector under high-water-level condition
The utility model discloses a construction protection foot under a high water level condition. Wherein the bearing platform is arranged at the bottom of a riverway, the anchor is arranged below the bearing platform, the continuous wall protection foot is arranged on the bearing platform, the side ba...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model discloses a construction protection foot under a high water level condition. Wherein the bearing platform is arranged at the bottom of a riverway, the anchor is arranged below the bearing platform, the continuous wall protection foot is arranged on the bearing platform, the side baffle is fixed to the bearing platform and located on the outer side of the continuous wall protection foot, and the protection dam is fixedly installed on the upper portion of the continuous wall protection foot. And the protective dam is laid on the slope bank. According to the utility model, the riverway desilting material is piled on the shore-side pile platform and sleeved with the cement-soil mixing piles to form the continuous wall as the protective foot, so that the construction is convenient and easy, the riverway desilting material is reutilized, precipitation operation is not needed, and energy and labor cost are saved.
本实用新型公开了一种高水位条件下施工护脚,包括设置河道底部的承重平台、设置在承重平台下方的锚固、设置在承重平台上的连续墙护脚、固定在承重平台上且位于连续墙护脚外侧的侧挡板以 |
---|