Interim landing stage that marine moving platform set up when berthhing fixed platform

The utility model belongs to the technical field of marine production platform, a interim landing stage that marine moving platform set up when berthhing fixed platform is disclosed, include cantilever scaffold who is set up by fixed platform and the cantilever scaffold who is set up by moving platf...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LIU ZHENGWEI, CHEN ZHUOMING, MA ZHAOFENG, MENG QINGPENG, ZHUANG JIZE, GAO LIANYE, SHI JIANRONG, CHEN RUIBAO, MU SHENGJUN, LAN WEI, ZHENG LU, CHEN CHENG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LIU ZHENGWEI
CHEN ZHUOMING
MA ZHAOFENG
MENG QINGPENG
ZHUANG JIZE
GAO LIANYE
SHI JIANRONG
CHEN RUIBAO
MU SHENGJUN
LAN WEI
ZHENG LU
CHEN CHENG
description The utility model belongs to the technical field of marine production platform, a interim landing stage that marine moving platform set up when berthhing fixed platform is disclosed, include cantilever scaffold who is set up by fixed platform and the cantilever scaffold who is set up by moving platform, two cantilever scaffold butt joints set up and leave the free gap in butt joint department, andthe connection footboard of one end ligature, not ligature of the other end is laid by free gap department, the cantilever scaffold top is paved with the scaffold board as shuttling back and forth platform and be used for placing pipeline and cable, two cantilever scaffold hang on two steel construction portal frame through many wire rope respectively, and two steel construction portal frame arefixed in fixed platform and moving platform's limit portion respectively. The utility model discloses utilize scaffold to replace traditional steel landing stage, laying of pipeline and cable can be guaranteed again to securit
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN207987708UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN207987708UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN207987708UU3</originalsourceid><addsrcrecordid>eNqNyj0LwjAQgOEsDqL-h8NdKDqkzqWii5N1Lae9NIHkEpLz4-dLQZyd3uF55-p6YqHsAnjkwfEIRXAkEIsCAbNjghCfEySPYmIOUEjgkeBlieFGWayd2Lg3Db9pqWYGfaHVtwu1PrSX5rihFHsqCe_EJH1z3lZ6X2td1V23-2v6AKxWOq8</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Interim landing stage that marine moving platform set up when berthhing fixed platform</title><source>esp@cenet</source><creator>LIU ZHENGWEI ; CHEN ZHUOMING ; MA ZHAOFENG ; MENG QINGPENG ; ZHUANG JIZE ; GAO LIANYE ; SHI JIANRONG ; CHEN RUIBAO ; MU SHENGJUN ; LAN WEI ; ZHENG LU ; CHEN CHENG</creator><creatorcontrib>LIU ZHENGWEI ; CHEN ZHUOMING ; MA ZHAOFENG ; MENG QINGPENG ; ZHUANG JIZE ; GAO LIANYE ; SHI JIANRONG ; CHEN RUIBAO ; MU SHENGJUN ; LAN WEI ; ZHENG LU ; CHEN CHENG</creatorcontrib><description>The utility model belongs to the technical field of marine production platform, a interim landing stage that marine moving platform set up when berthhing fixed platform is disclosed, include cantilever scaffold who is set up by fixed platform and the cantilever scaffold who is set up by moving platform, two cantilever scaffold butt joints set up and leave the free gap in butt joint department, andthe connection footboard of one end ligature, not ligature of the other end is laid by free gap department, the cantilever scaffold top is paved with the scaffold board as shuttling back and forth platform and be used for placing pipeline and cable, two cantilever scaffold hang on two steel construction portal frame through many wire rope respectively, and two steel construction portal frame arefixed in fixed platform and moving platform's limit portion respectively. The utility model discloses utilize scaffold to replace traditional steel landing stage, laying of pipeline and cable can be guaranteed again to securit</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2018</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20181019&amp;DB=EPODOC&amp;CC=CN&amp;NR=207987708U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20181019&amp;DB=EPODOC&amp;CC=CN&amp;NR=207987708U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LIU ZHENGWEI</creatorcontrib><creatorcontrib>CHEN ZHUOMING</creatorcontrib><creatorcontrib>MA ZHAOFENG</creatorcontrib><creatorcontrib>MENG QINGPENG</creatorcontrib><creatorcontrib>ZHUANG JIZE</creatorcontrib><creatorcontrib>GAO LIANYE</creatorcontrib><creatorcontrib>SHI JIANRONG</creatorcontrib><creatorcontrib>CHEN RUIBAO</creatorcontrib><creatorcontrib>MU SHENGJUN</creatorcontrib><creatorcontrib>LAN WEI</creatorcontrib><creatorcontrib>ZHENG LU</creatorcontrib><creatorcontrib>CHEN CHENG</creatorcontrib><title>Interim landing stage that marine moving platform set up when berthhing fixed platform</title><description>The utility model belongs to the technical field of marine production platform, a interim landing stage that marine moving platform set up when berthhing fixed platform is disclosed, include cantilever scaffold who is set up by fixed platform and the cantilever scaffold who is set up by moving platform, two cantilever scaffold butt joints set up and leave the free gap in butt joint department, andthe connection footboard of one end ligature, not ligature of the other end is laid by free gap department, the cantilever scaffold top is paved with the scaffold board as shuttling back and forth platform and be used for placing pipeline and cable, two cantilever scaffold hang on two steel construction portal frame through many wire rope respectively, and two steel construction portal frame arefixed in fixed platform and moving platform's limit portion respectively. The utility model discloses utilize scaffold to replace traditional steel landing stage, laying of pipeline and cable can be guaranteed again to securit</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2018</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyj0LwjAQgOEsDqL-h8NdKDqkzqWii5N1Lae9NIHkEpLz4-dLQZyd3uF55-p6YqHsAnjkwfEIRXAkEIsCAbNjghCfEySPYmIOUEjgkeBlieFGWayd2Lg3Db9pqWYGfaHVtwu1PrSX5rihFHsqCe_EJH1z3lZ6X2td1V23-2v6AKxWOq8</recordid><startdate>20181019</startdate><enddate>20181019</enddate><creator>LIU ZHENGWEI</creator><creator>CHEN ZHUOMING</creator><creator>MA ZHAOFENG</creator><creator>MENG QINGPENG</creator><creator>ZHUANG JIZE</creator><creator>GAO LIANYE</creator><creator>SHI JIANRONG</creator><creator>CHEN RUIBAO</creator><creator>MU SHENGJUN</creator><creator>LAN WEI</creator><creator>ZHENG LU</creator><creator>CHEN CHENG</creator><scope>EVB</scope></search><sort><creationdate>20181019</creationdate><title>Interim landing stage that marine moving platform set up when berthhing fixed platform</title><author>LIU ZHENGWEI ; CHEN ZHUOMING ; MA ZHAOFENG ; MENG QINGPENG ; ZHUANG JIZE ; GAO LIANYE ; SHI JIANRONG ; CHEN RUIBAO ; MU SHENGJUN ; LAN WEI ; ZHENG LU ; CHEN CHENG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN207987708UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2018</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>LIU ZHENGWEI</creatorcontrib><creatorcontrib>CHEN ZHUOMING</creatorcontrib><creatorcontrib>MA ZHAOFENG</creatorcontrib><creatorcontrib>MENG QINGPENG</creatorcontrib><creatorcontrib>ZHUANG JIZE</creatorcontrib><creatorcontrib>GAO LIANYE</creatorcontrib><creatorcontrib>SHI JIANRONG</creatorcontrib><creatorcontrib>CHEN RUIBAO</creatorcontrib><creatorcontrib>MU SHENGJUN</creatorcontrib><creatorcontrib>LAN WEI</creatorcontrib><creatorcontrib>ZHENG LU</creatorcontrib><creatorcontrib>CHEN CHENG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LIU ZHENGWEI</au><au>CHEN ZHUOMING</au><au>MA ZHAOFENG</au><au>MENG QINGPENG</au><au>ZHUANG JIZE</au><au>GAO LIANYE</au><au>SHI JIANRONG</au><au>CHEN RUIBAO</au><au>MU SHENGJUN</au><au>LAN WEI</au><au>ZHENG LU</au><au>CHEN CHENG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Interim landing stage that marine moving platform set up when berthhing fixed platform</title><date>2018-10-19</date><risdate>2018</risdate><abstract>The utility model belongs to the technical field of marine production platform, a interim landing stage that marine moving platform set up when berthhing fixed platform is disclosed, include cantilever scaffold who is set up by fixed platform and the cantilever scaffold who is set up by moving platform, two cantilever scaffold butt joints set up and leave the free gap in butt joint department, andthe connection footboard of one end ligature, not ligature of the other end is laid by free gap department, the cantilever scaffold top is paved with the scaffold board as shuttling back and forth platform and be used for placing pipeline and cable, two cantilever scaffold hang on two steel construction portal frame through many wire rope respectively, and two steel construction portal frame arefixed in fixed platform and moving platform's limit portion respectively. The utility model discloses utilize scaffold to replace traditional steel landing stage, laying of pipeline and cable can be guaranteed again to securit</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN207987708UU
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Interim landing stage that marine moving platform set up when berthhing fixed platform
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-12T19%3A03%3A36IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LIU%20ZHENGWEI&rft.date=2018-10-19&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN207987708UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true