Interim landing stage that marine moving platform set up when berthhing fixed platform
The utility model belongs to the technical field of marine production platform, a interim landing stage that marine moving platform set up when berthhing fixed platform is disclosed, include cantilever scaffold who is set up by fixed platform and the cantilever scaffold who is set up by moving platf...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model belongs to the technical field of marine production platform, a interim landing stage that marine moving platform set up when berthhing fixed platform is disclosed, include cantilever scaffold who is set up by fixed platform and the cantilever scaffold who is set up by moving platform, two cantilever scaffold butt joints set up and leave the free gap in butt joint department, andthe connection footboard of one end ligature, not ligature of the other end is laid by free gap department, the cantilever scaffold top is paved with the scaffold board as shuttling back and forth platform and be used for placing pipeline and cable, two cantilever scaffold hang on two steel construction portal frame through many wire rope respectively, and two steel construction portal frame arefixed in fixed platform and moving platform's limit portion respectively. The utility model discloses utilize scaffold to replace traditional steel landing stage, laying of pipeline and cable can be guaranteed again to securit |
---|