Be applicable to transformer prophylactic test test system
This application embodiment discloses a be applicable to transformer prophylactic test test system, includes: mark copper billet, test wire, test equipment, wherein, the mark copper billet sets up onthe lead -out wire mark zone of transformer, will the one end plug of test wire inserts in the jack o...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This application embodiment discloses a be applicable to transformer prophylactic test test system, includes: mark copper billet, test wire, test equipment, wherein, the mark copper billet sets up onthe lead -out wire mark zone of transformer, will the one end plug of test wire inserts in the jack of mark copper billet, to the test wire that is used for the short circuit, the other end plug of test wire inserts in the jack of mark copper billet, to other test wires, the other end plug of test wire inserts test equipment.
本申请实施方式公开了种适用于变压器预防性试验测试系统,包括:标记铜块、测试线、测试设备;其中,所述标记铜块设置在变压器的引出线标记区域上;将所述测试线的端插头插入所述标记铜块的插孔内,对于用于短接的测试线来说,所述测试线的另端插头插入所述标记铜块的插孔内,对于其他测试线来说,所述测试线的另端插头插入所述测试设备。 |
---|