Pier binder bent cap construction trolley
The utility model relates to a pier binder bent cap construction trolley, be equipped with two at least preformed holes on every pier stud of pier, all preformed holes are located same horizontal plane, be provided with load -bearing part in every preformed hole, the pier stud lateral wall is all st...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model relates to a pier binder bent cap construction trolley, be equipped with two at least preformed holes on every pier stud of pier, all preformed holes are located same horizontal plane, be provided with load -bearing part in every preformed hole, the pier stud lateral wall is all stretched out at every load -bearing part's both ends, a support component is connected simultaneouslyto all load -bearing part tops of every pier stud both sides, it all connects a plurality of jack on two support components of every pier stud both sides to be located, two support components correspond respectively and are provided with the girder, two girders are connected in a plurality of jack tip that corresponds, connect through two spreader beams respectively between the tip of two girders. Utilize this construction trolley, need not build the scaffold frame by the ground, directly set up binder bent cap construction trolley on the pier stud, convenient and fast, the time limit for a project is short, and the |
---|