Structure is puted forth effort to prefabricated bridge pier
The utility model discloses a structure is puted forth effort to prefabricated bridge pier belongs to the prefabricated bridge field, its technical scheme main points are including the pier mound body, be equipped with the heavy frame on the pier mound body, swing joint between the heavy frame and t...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model discloses a structure is puted forth effort to prefabricated bridge pier belongs to the prefabricated bridge field, its technical scheme main points are including the pier mound body, be equipped with the heavy frame on the pier mound body, swing joint between the heavy frame and the pier mound body, including garter spring, force bearing rod, the garter spring cover is located on the pier mound body, force bearing rod one end articulates on the garter spring, be equipped with the rib pole between the force bearing rod and the pier mound body, rib pole one end and the pier mound body is articulated, and the other end is equipped with the conflict head, the head of contradicting when the force bearing rod level is placed, is contradicted with force bearing rod and is met.By adopting the above technical scheme, in when construction, the instrument is puted forth effort, put for the ease of the workman, rib pole and force bearing rod rotate, and force bearing rod rotates the department to horiz |
---|