Can consolidate precast pile of ground
The utility model provides a can consolidate precast pile of ground belongs to the building engineering field, can consolidate precast pile of ground, including pile body and reserved pipe way, reserved pipe says and sets up inside the pile body, the one end that reserved pipe said is the top, and t...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model provides a can consolidate precast pile of ground belongs to the building engineering field, can consolidate precast pile of ground, including pile body and reserved pipe way, reserved pipe says and sets up inside the pile body, the one end that reserved pipe said is the top, and the other end that reserved pipe said is the bottom, and the top that reserved pipe said is connectedwith first shutoff piece, and the bottom that reserved pipe said is connected with second shutoff piece, second shutoff piece and reserved pipe say can dismantle the connection. This kind of can consolidate precast pile of ground, after the construction was accomplished, it, can be through taking out first shutoff piece and second shutoff piece not enough the time to detect stake end bearing capacity to can say to high pressure jet and slip casting reserve way through reserved pipe that convenient soil layer to the stake end carries out reinforcing construction.
本实用新型提供了种可加固地基的预制桩,属于建筑工程领域,可加固地基的预制桩,包括桩体和预留管道,预留管道设置在 |
---|