Big -and -middle -sized gas turbine land test bench system
The utility model belongs to the technical field of gas turbine test equipment, concretely relates to big -and -middle -sized gas turbine land test bench system. This system includes trial zone, electricity distribution room and debugging operation room. Gas turbine main part, test bench bed frame,...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model belongs to the technical field of gas turbine test equipment, concretely relates to big -and -middle -sized gas turbine land test bench system. This system includes trial zone, electricity distribution room and debugging operation room. Gas turbine main part, test bench bed frame, air inlet unit, exhaust apparatus, induction apparatus, fuel sled, lubricating oil sled, compress air system, hydraulic dynamometer and circulating water system are covered to the trial zone, distribution indoor arrangement has DC power supply case and AC distribution box, gives control, fire control and the power supply of other equipment respectively, the indoor monitor control platform that is equipped with of debugging operation, the monitor control platform is contained to be had: steeringcontrol subassembly, lubricating oil control assembly, fuel control assembly, air control assembly, water system control assembly and long -range video component etc. The utility model discloses test-bed structure is complete |
---|