Supplementary construction platform finalizes design in high -speed railway mound
The utility model belongs to high -speed railway mound construction field has limitation and the inefficiency scheduling problem of setting up scaffold frame construction railway mound outside the pier shaft now for solving, the utility model provides a supplementary construction platform finalizes...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model belongs to high -speed railway mound construction field has limitation and the inefficiency scheduling problem of setting up scaffold frame construction railway mound outside the pier shaft now for solving, the utility model provides a supplementary construction platform finalizes design in high -speed railway mound is formed by lower supreme connecting gradually by section platform of a plurality of festivals, festival section platform is including the frame of stereotyping, and the frame of stereotyping is the multilayer square body frame construction who is connected to form by a plurality of stands, longitudinal tie pole and transverse connection pole, and the longitudinal tie pole is the operation panel with the planar layer of transverse connection pole constitution, the outside of every layer of operation panel is equipped with the position circle, and the position circle constitutes the inboard spacing face of railway pier shaft reinforcing bar template. The utility model discloses l |
---|