Bogie system and high speed train monitoring system
The utility model provides a bogie system and high speed train monitoring system, the bogie system, including bogie body, gear box and the processing module of setting on the bogie body, the bogie body includes the jib, and the one end and the jib of gear box are connected, the jib is provided with...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model provides a bogie system and high speed train monitoring system, the bogie system, including bogie body, gear box and the processing module of setting on the bogie body, the bogie body includes the jib, and the one end and the jib of gear box are connected, the jib is provided with first reference platform with the junction of gear box, is provided with the second reference platform on the gear box, be provided with a positioner on the second reference platform, a positioner is connected with the processing module communication, a positioner is used for measuring the distance of first reference platform for the second reference platform. The utility model provides a bogie system can the relative bogie body of real -time supervision gear box positional information, preventing the deviation, too big and part that arouse destroys to ensure spare part performance in the system. Can also need not to dismantle again the measurement through the discrepancy adjustment that obtains, improve the work e |
---|