Use new material and optimize absorption tower

The utility model discloses an use new material and optimize absorption tower, including the absorption tower main part, tower the following side that the bottom of absorption tower main part was equipped with is connected with the fluid -discharge tube, bottom at the bottom of the tower is equipped...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: SI JIYONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The utility model discloses an use new material and optimize absorption tower, including the absorption tower main part, tower the following side that the bottom of absorption tower main part was equipped with is connected with the fluid -discharge tube, bottom at the bottom of the tower is equipped with and increases steady platform, the top of the tower top that the top of absorption tower main part was equipped with is connected with the purified gas contact tube, and one side of absorption tower main part is connected with the feed gas induction pipe near position at the bottom of the tower, and the positive interval of absorption tower main part is provided with the climbing and overhauls the mechanism. The utility model discloses improve the exterior structure on absorption tower, can improve the safety in utilization of this absorption tower when repair and maintenance, improve whole steadiness and the stability of absorption tower when using for this absorption tower remains throughout in balanced fir