Silt muddy coast slows down at artifical sandy beach mud piping lane system of taking out of argillization

The utility model discloses a silt muddy coast slows down at artifical sandy beach mud piping lane system of taking out of argillization, passing through the mud pipeline including many of burying underground in artifical sandy beach below, passing through the mud pipeline and arrange in the same di...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LI MENGGUO, HOU ZHIQIANG, XIE MINGXIAO, YANG ZHIWEN, YANG HUA
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The utility model discloses a silt muddy coast slows down at artifical sandy beach mud piping lane system of taking out of argillization, passing through the mud pipeline including many of burying underground in artifical sandy beach below, passing through the mud pipeline and arrange in the same direction as the sandy beach slope, the upper end lies in climax bit line department, and the lower extreme lies in low tide bit line department, and all lower extremes that pass through the mud pipeline say with the sludge pipe all and is connected that the one end of sludge pipe way is closed, and the export of the other end for leaning out artifical sandy beach sediment trapping dyke is equipped with in the sludge pipe way and takes out the muddy water pump, it has into the discharge orifice to gather on passing through the mud pipeline, covers to have in the top of passing through the mud pipeline to be used for mud to protect husky geotextile. The utility model discloses can greatly slow down the argillization s