Tunnel concrete floor and low wall pour template device
The utility model relates to a tunnel concrete floor and low wall pour template device. It includes two template A, B, two template A, B's an end be 45 jiaos to form L type built -up plate 45 jiaos with the bolted connection post assembling with template A and template B, arrange tunnel concret...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model relates to a tunnel concrete floor and low wall pour template device. It includes two template A, B, two template A, B's an end be 45 jiaos to form L type built -up plate 45 jiaos with the bolted connection post assembling with template A and template B, arrange tunnel concrete floor and low wall's the process of pouring in, the equipment of template A, B accomplish after, in vertical template, carry out whole reinforcement with built -in pull rod template reinforcement, template A and template B have set up a fixed block 45 jiaos of junctions. Dismantle the back with connecting bolt, can guarantee that low wall position template does not receive to carry out baseplate concrete and once only wipe one's face with base plate portion position removal of form under the circumstances of disturbance. Use the utility model discloses a mass defect that the concrete was located to the bottom plate and the side wall angle of intersection has been eliminated totally to device, but tunnel bottom plate a |
---|