Target installation tool
The utility model provides a target installation tool, include: a target mount unit for the fixed target material, hoist and mount portion has on the target mount unit, can with the target bearing unit that target mount unit detachably connects, and, with target bearing unit connects, is used for re...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model provides a target installation tool, include: a target mount unit for the fixed target material, hoist and mount portion has on the target mount unit, can with the target bearing unit that target mount unit detachably connects, and, with target bearing unit connects, is used for removing target bearing unit to move the mobile unit of target. The utility model discloses increase equipment capacity realize the reduction of the time of target exchange operation, and then improve equipment is transferred to the reduction of bottleneck equipment overhead traveling crane live time in the time of can realizing the target installation, and then the quick dismantlement and the installation of realization target.
本实用新型提供了种靶材安装治具,包括:用于固定靶材的靶材固定架单元,所述靶材固定架单元上具有吊装部;能够与所述靶材固定架单元可拆卸地连接的靶材承载单元;以及,与所述靶材承载单元连接,用于移动所述靶材承载单元,以移动靶材的移动单元。本实用新型可以实现靶材安装时瓶颈设备天车使用时间的减少,进而实现靶材的快速拆卸及安装,实现靶材交换作业的时间的降低,进而提高设备嫁动增加设备产能。 |
---|