Middle pole setting in interim construction protection fence

The utility model discloses a middle pole setting in interim construction protection fence belongs to the architectural engineering technology field, a middle pole setting in interim construction protection fence, including base (1), be equipped with stand (6) on base (1), the top of stand (6) and m...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LI SHENGYOU, CHI XIANG, ZHANG WEIJIE, ZHANG XIANLI, HAN LU
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The utility model discloses a middle pole setting in interim construction protection fence belongs to the architectural engineering technology field, a middle pole setting in interim construction protection fence, including base (1), be equipped with stand (6) on base (1), the top of stand (6) and middle part are equipped with through -hole (5) that supply horizontal pole (2) to pass respectively, and the both sides of through -hole (5) are equipped with fixed orifices (4) that can supply bolt (3) to pass, horizontal pole (2) are connected with through -hole (5) through bolt (3). Its advantage is: the utility model provides a steadiness of middle pole setting is good, simple structure, the both sides of the through -hole of middle pole setting are equipped with the bar fixed orifices that can supply the bolt to pass, have realized the fine setting of horizontal pole height, are that the atress of rail guard is balanced, and difficult quilt overturnes, this centre pole setting can be dismantled, repeatedly usa