Shaft ore bin buffering connects ore deposit chamber

The utility model provides a shaft ore bin buffering connects ore deposit chamber, the chamber is located the opposite side wall of a well relative with side dump car, the chamber bottom surface is equipped with the bilayer and spouts the anchor net, and this bilayer spouts the online terminal surfa...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZOU LONG, FU GUANGNIAN, GUO HUIGAO, CHEN ZHONGJIE, XU YINGPEI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The utility model provides a shaft ore bin buffering connects ore deposit chamber, the chamber is located the opposite side wall of a well relative with side dump car, the chamber bottom surface is equipped with the bilayer and spouts the anchor net, and this bilayer spouts the online terminal surface rigid coupling of anchor has the backplate, and the rigid coupling has the guardrail on this backplate. The utility model discloses an establish the chamber, bear the impact force in ore deposit by the chamber to protect the former ore bin wall of a well and welt, the chamber is equipped with that the bilayer spouts anchor net and the steel bow member is strutted, it is firm safe, durable lastingly more to make the chamber. 种竖井矿仓缓冲接矿硐室,所述硐室位于与侧卸式矿车相对的另侧井壁上,所述硐室底面设有双层喷锚网,该双层喷锚网上端面固接有护板,该护板上固接有护轨。本实用新型通过设立硐室,由硐室承受到落矿的冲击力,从而保护原矿仓井壁及衬板;硐室设有双层喷锚网以及钢拱架支护;使硐室更加牢固安全、持久耐用。