Subway is synthesized a hoist and mount and is put
The utility model provides a subway is synthesized a hoist and mount and is put, it includes: jib group, it includes first jib and second jib, first jib with second jib cruciate fixation, just the cross section hangs the site for first, the lower extreme of first jib sets up first extension rod, jus...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model provides a subway is synthesized a hoist and mount and is put, it includes: jib group, it includes first jib and second jib, first jib with second jib cruciate fixation, just the cross section hangs the site for first, the lower extreme of first jib sets up first extension rod, just first extension rod with the junction of first jib sets up the second and hangs the site, the lower extreme of second jib sets up the second extension rod, just the second extension rod with junction that the second hung sets up the third and hangs the site, at least four are hung the piece, and it respectively will first jib the second jib first extension rod with the one end of second extension rod is fixed in a fixed structure department, three mounting is fixed respectively first is hung site, second and hangs site and third and hang site department. The utility model provides an individual subway is synthesized a hoist and mount and is put can provide three and hang the site, and the inner space is practiced thrift in the rational planning and scientific arrangement ground iron conduit overall arrangement of being convenient for. |
---|