Pipeline filling material construction equipment

The utility model provides a pipeline filling material construction equipment, the layer board is connected with the bearing plate through spacing wire rope, and the bearing plate is connected with location wire rope's one end, and location wire rope's the other end is fixed, it has flexib...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: DING GUOTAI, HU FANGHUA, FEI BOTAO, YANG XIAOHUA, XUE LIANFU, LI GUANGYU, BAI YUANWU, LI JIAFU, MA JUN, LIU GUO, LUO LEI, XIONG JIANWU
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The utility model provides a pipeline filling material construction equipment, the layer board is connected with the bearing plate through spacing wire rope, and the bearing plate is connected with location wire rope's one end, and location wire rope's the other end is fixed, it has flexible shutoff to pack to fill between layer board and bearing plate. It packs to clog flexible shutoff at the drill way of the shutoff steel pipe intraductal manual synchronization of section to progressively to intraductal propulsion, wait to clog finish and whole do not have an intraductal certain distance of man -hole opening section after, will fix a position wire rope and fix on the wire rope fixed loop of shutoff steel pipe drill way section inner wall, the location wire rope coil in proper order in shutoff steel pipe mouth of pipe sector hole, the mouth of pipe and the water piping connection of shutoff steel pipe, the water pipe is connected with the water pump, start the water pump pressurized -water to pressurize a period, realize the shutoff construction of pipeline filling material location through above step. Having solved and having received restriction remote, nonlinear line shutoff steel pipe, conventional traditional construction process that clogs can't satisfy the defect that shutoff steel pipe depths staple and SR clogged the construction.