Stability can good electric energy meter
The utility model discloses a stability can good electric energy meter, including the electric energy meter body and install at inside operating circuit, master control CPU and the magnetism freeze mode load switch of electric energy meter body, the electric energy meter this internal still be equip...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model discloses a stability can good electric energy meter, including the electric energy meter body and install at inside operating circuit, master control CPU and the magnetism freeze mode load switch of electric energy meter body, the electric energy meter this internal still be equipped with be used for controlling magnetism freeze mode load switch break -make close the separating brake circuit, electric energy meter body surface is equipped with transparent shell, is equipped with in the transparent shell and washs the mechanism, washs the mechanism and includes connecting rod, brush board, all is equipped with the brush hair on the brush board, and the brush hair is contradicted with the display screen department of transparent shell, electric energy meter respectively, and the brush board passes through connecting rod fixed connection, is equipped with the pull rod on the connecting rod. The utility model discloses greasy weather gas is sent out at the wet weather to simple structure, practicality, can check meter convenient and fast, durable smoothly, and when going up the electricity in initial installation back, avoid having reduced the transportation loss of electric energy meter because of the abnormal or too big load switch of leading to of electric current of load switch work burns out, arouses the problem that the electric energy meter damaged, improved the reliability of electric energy meter use. |
---|