Laborsaving support is used to 10 kilovolt detachable concrete bridge lines
The utility model relates to a laborsaving support is used to 10 kilovolt detachable concrete bridge lines, including parallel upper and lower staple bolt of arranging, go up staple bolt both sides level and lay the drag link of symmetry, the oblique pull rod of symmetry is installed to the staple b...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model relates to a laborsaving support is used to 10 kilovolt detachable concrete bridge lines, including parallel upper and lower staple bolt of arranging, go up staple bolt both sides level and lay the drag link of symmetry, the oblique pull rod of symmetry is installed to the staple bolt side down, oblique pull rod middle part and drag link outer end are fixed continuous, evenly lay in the same direction as oblique pull rod interval to be used for the tie point continuous with the overhead line coaster. Owing to implement above-mentioned technical scheme, this application is convenient for carry out the overhead line construction to the diameter at 185mm-240mm's wire. But greatly reduced working strength of worker reduces physical power output, reduces the construction risk, improves the efficiency of construction. |
---|