Steel-pipe pile basis combination steel trestle

The utility model belongs to the technical field of aquatic bridge sidewalk construction, traditional structural style landing stage construction speed is slow, the installation is complicated in order to solve, the technical problem of poor stability, provides a steel-pipe pile basis combination st...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHEN XU, FENG HENGWANG, SUN ZHONGHUA, LI CAIHONG
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The utility model belongs to the technical field of aquatic bridge sidewalk construction, traditional structural style landing stage construction speed is slow, the installation is complicated in order to solve, the technical problem of poor stability, provides a steel-pipe pile basis combination steel trestle, including steel-pipe pile, crossbeam, bei leiliang and bridge floor steel sheet, steel-pipe pile along the vertical equidistant a plurality of rows that arrange of landing stage length direction, every row horizontal equidistant arranges a plurality of steel-pipe piles, during earth was all squeezed into under water to the lower part of said steel-pipe pile, the well upper portion of transversal arrangement's two adjacent steel-pipe piles was propped fixedly through horizontally connect pole and scissors, and the crossbeam is set up at the top of transversal arrangement's steel-pipe pile, and bei leiliang vertically sets up perpendicularly on the crossbeam of steel-pipe pile upper portion, and beileiliang passes through U sections spare with the crossbeam and is connected, and shellfish leiliang lays on upper portion the bridge floor steel sheet, and bridge floor steel sheet both sides set up the guard rail along landing stage length direction. The utility model discloses the installation is simple, and stability is good, has improved landing stage construction speed, has reduced construction cost, has guaranteed the safety of later stage use.