Prefabricated pile penetration blocker
The utility model provides a precast pile hinders the import, the precast pile is pressed the stake elevation and is not controlled the scheduling problem well in the current solar project construction of main solution. Should hinder the import and include the clamp ring, the friction pad backplate...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model provides a precast pile hinders the import, the precast pile is pressed the stake elevation and is not controlled the scheduling problem well in the current solar project construction of main solution. Should hinder the import and include the clamp ring, the friction pad backplate hinders the import barrier plate, stiffening rib, clamp ring axostylus axostyle, abrasive rubber pad, binding clasp, bolt. The utility model discloses a precast pile hinders the import is with low costs, and the device is simple, the good reliability to circulated use. Install it in the pile body elevation department of burying, solve a very thorny difficult problem in the engineering, greatly reduced construction investment, reduction of erection time. |
---|