Digging, anchoring and drilling integrated hard rock heading machine

The utility model belongs to the technical field of heading machines, and particularly relates to a digging, anchoring and drilling integrated hard rock heading machine which solves the problems of an existing digging and anchoring integrated machine. The digging, anchoring and drilling integrated h...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG SHUAI, LI JUN, ZHANG CHANGQING, LIU GUOPENG, QUAN YUYUN, MA ZHAO, WANG YAO, YANG CHUNHAI, WU JINJUN, YUE XIAOHU, WANG ZHENGHONG, LYU YI, QIN YANKAI, ZHOU JIANLONG, ZHAO HAIXIA, QIN GUOQIANG, ZHANG XIANLIE, LANG YAN, GAO WEI, LIU ZIJING, WANG BINGXIAO, BAI XUEFENG, YAN MANJUN, WANG SHEJI, JIA SHAOSHAN, HAO JIANSHENG, SU YUMING, MAO JIWEI, WANG CHUANWU, ZHU DIANYE, WANG XUECHENG, JI JUNWEI, MA JUNJIE, FANG XIANGMING
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The utility model belongs to the technical field of heading machines, and particularly relates to a digging, anchoring and drilling integrated hard rock heading machine which solves the problems of an existing digging and anchoring integrated machine. The digging, anchoring and drilling integrated hard rock heading machine comprises a cutting part, a loading part, a drilling machine system, a working platform, a crawler belt, a pump station oil tank, a hydraulic control box, an electric control box, an operating table and a conveyor. A drilling machine supporting frame is arranged on the left side of the whole machine and located above the crawler belt, a sliding guide rail is arranged on the drilling machine supporting frame and can move front and back relative to the drilling machine supporting frame, and the drilling machine system is arranged on the sliding guide rail and can move front and back relative to the sliding guide rail. The integrated pump station oil tank is arranged in the front of the right side of the whole machine, the hydraulic control box is arranged in the right middle of the whole machine, and the electric control box is arranged in the right back of the whole machine. The operating table is arranged at the position, between the hydraulic control box and the drilling machine system, of the middle of the whole machine and located in front of the conveyor. A drilling machine is truly integrated in the whole machine, the height of the machine body integrated with the drilling machine is kept the same as that of an original machine body, the influence on the height of the whole machine from the drilling machine is reduced to the minimum, and the height of the whole machine is not influenced.