Improved electric meter box
The utility model relates to an improved electric meter box. The improved electric meter box includes a main switch room and a power distribution box which is longitudinally connected with the main switch room; the main switch room and the power distribution box are respectively an independent box b...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model relates to an improved electric meter box. The improved electric meter box includes a main switch room and a power distribution box which is longitudinally connected with the main switch room; the main switch room and the power distribution box are respectively an independent box body; the power distribution box includes an electric meter room, a micro circuit breaker room and a busbar room which are located from up to down, wherein the electric meter room is separated from the micro circuit breaker room through a first baffle, and the micro circuit breaker room is separated from the busbar room through a second baffle; a line incoming circuit breaker is arranged in the main switch room; a plurality of watt hour meters are arranged in the electric meter room; a micro circuit breaker is arranged in the micro circuit breaker room; a plurality of copper bars are arranged in the busbar room; a plurality of line branching holes are respectively formed in each copper bar; a plurality of through holes through which wires can pass are formed in the outer surface of the main switch room and the outer surface of the busbar room respectively; one end of each wire is connected with the line incoming circuit breaker, and the other end of each wire is connected with the watt hour meter through the line branching hole in the copper bar; and the watt hour meters are connected with the micro circuit breaker. According to the improved electric meter box of the utility model, one busbar room is additionally adopted, and therefore, when the improved electric meter box is used, excellent wiring can be realized, and an aesthetic property and neatness can be realized, and possibility of making mistakes is low. |
---|