Bathroom wall stone installation structure for high-rise buildings

The utility model discloses a bathroom wall stone installation structure for high-rise buildings. The bathroom wall stone installation structure comprises a fixing piece (1), first waterproof adhesive tapes (2) and novel composite panel stone materials (4), wherein the fixing piece (1) is transverse...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SONG HAO, YAN RUI, YANG ZIYUAN, LI HAIJUN, SHAO JIUDONG, DING NING, JI FANG'AN, MAO YUE, ZENG YANGHUI, XUE MINGHAO, ZHANG DONGYING, WANG JIAN, HAN SONG, TAN LEI, ZHANG YI, HUANG ZAIKUN, ZHANG ZIJIAN, XU WENYUAN, TIAN ZHUZHU
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator SONG HAO
YAN RUI
YANG ZIYUAN
LI HAIJUN
SHAO JIUDONG
DING NING
JI FANG'AN
MAO YUE
ZENG YANGHUI
XUE MINGHAO
ZHANG DONGYING
WANG JIAN
HAN SONG
TAN LEI
ZHANG YI
HUANG ZAIKUN
ZHANG ZIJIAN
XU WENYUAN
TIAN ZHUZHU
description The utility model discloses a bathroom wall stone installation structure for high-rise buildings. The bathroom wall stone installation structure comprises a fixing piece (1), first waterproof adhesive tapes (2) and novel composite panel stone materials (4), wherein the fixing piece (1) is transversely and fixedly arranged on the wall, and the outer side of the fixing piece (1) is transversely provided with an inserting piece; the first waterproof adhesive tape (2) is provided with an inserting groove and is connected with the fixing piece (1) through the inserting groove and the inserting piece, and the upper and lower sides of the novel composite panel stone materials (4) are provided with first grooves; the first waterproof adhesive tapes (2) are embedded in the first grooves, and the two adjacent novel composite panel stone materials (4) are connected and fixed by the first waterproof adhesive tapes (2). The bathroom wall stone installation structure for high-rise buildings provided by the utility model has the advantages that the installation time and the labor cost of ultra-large space bathroom stone wall are significantly reduced, the installation quality and efficiency are improved, the increasingly high demands of construction period, quality and cost control on the project are effectively met, and the best effects are realized.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN203905365UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN203905365UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN203905365UU3</originalsourceid><addsrcrecordid>eNrjZHBySizJKMrPz1UoT8zJUSguyc9LVcjMKy4B8hJLMvPzgEJFpcklpUWpCmn5RQoZmekZukWZxakKSaWZOSmZeenFPAysaYk5xam8UJqbQcnNNcTZQze1ID8-tbggMTk1L7Uk3tnPyMDY0sDU2Mw0NNSYKEUA9vczfw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Bathroom wall stone installation structure for high-rise buildings</title><source>esp@cenet</source><creator>SONG HAO ; YAN RUI ; YANG ZIYUAN ; LI HAIJUN ; SHAO JIUDONG ; DING NING ; JI FANG'AN ; MAO YUE ; ZENG YANGHUI ; XUE MINGHAO ; ZHANG DONGYING ; WANG JIAN ; HAN SONG ; TAN LEI ; ZHANG YI ; HUANG ZAIKUN ; ZHANG ZIJIAN ; XU WENYUAN ; TIAN ZHUZHU</creator><creatorcontrib>SONG HAO ; YAN RUI ; YANG ZIYUAN ; LI HAIJUN ; SHAO JIUDONG ; DING NING ; JI FANG'AN ; MAO YUE ; ZENG YANGHUI ; XUE MINGHAO ; ZHANG DONGYING ; WANG JIAN ; HAN SONG ; TAN LEI ; ZHANG YI ; HUANG ZAIKUN ; ZHANG ZIJIAN ; XU WENYUAN ; TIAN ZHUZHU</creatorcontrib><description>The utility model discloses a bathroom wall stone installation structure for high-rise buildings. The bathroom wall stone installation structure comprises a fixing piece (1), first waterproof adhesive tapes (2) and novel composite panel stone materials (4), wherein the fixing piece (1) is transversely and fixedly arranged on the wall, and the outer side of the fixing piece (1) is transversely provided with an inserting piece; the first waterproof adhesive tape (2) is provided with an inserting groove and is connected with the fixing piece (1) through the inserting groove and the inserting piece, and the upper and lower sides of the novel composite panel stone materials (4) are provided with first grooves; the first waterproof adhesive tapes (2) are embedded in the first grooves, and the two adjacent novel composite panel stone materials (4) are connected and fixed by the first waterproof adhesive tapes (2). The bathroom wall stone installation structure for high-rise buildings provided by the utility model has the advantages that the installation time and the labor cost of ultra-large space bathroom stone wall are significantly reduced, the installation quality and efficiency are improved, the increasingly high demands of construction period, quality and cost control on the project are effectively met, and the best effects are realized.</description><language>eng</language><subject>BUILDING ; FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS ; FIXED CONSTRUCTIONS</subject><creationdate>2014</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20141029&amp;DB=EPODOC&amp;CC=CN&amp;NR=203905365U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20141029&amp;DB=EPODOC&amp;CC=CN&amp;NR=203905365U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SONG HAO</creatorcontrib><creatorcontrib>YAN RUI</creatorcontrib><creatorcontrib>YANG ZIYUAN</creatorcontrib><creatorcontrib>LI HAIJUN</creatorcontrib><creatorcontrib>SHAO JIUDONG</creatorcontrib><creatorcontrib>DING NING</creatorcontrib><creatorcontrib>JI FANG'AN</creatorcontrib><creatorcontrib>MAO YUE</creatorcontrib><creatorcontrib>ZENG YANGHUI</creatorcontrib><creatorcontrib>XUE MINGHAO</creatorcontrib><creatorcontrib>ZHANG DONGYING</creatorcontrib><creatorcontrib>WANG JIAN</creatorcontrib><creatorcontrib>HAN SONG</creatorcontrib><creatorcontrib>TAN LEI</creatorcontrib><creatorcontrib>ZHANG YI</creatorcontrib><creatorcontrib>HUANG ZAIKUN</creatorcontrib><creatorcontrib>ZHANG ZIJIAN</creatorcontrib><creatorcontrib>XU WENYUAN</creatorcontrib><creatorcontrib>TIAN ZHUZHU</creatorcontrib><title>Bathroom wall stone installation structure for high-rise buildings</title><description>The utility model discloses a bathroom wall stone installation structure for high-rise buildings. The bathroom wall stone installation structure comprises a fixing piece (1), first waterproof adhesive tapes (2) and novel composite panel stone materials (4), wherein the fixing piece (1) is transversely and fixedly arranged on the wall, and the outer side of the fixing piece (1) is transversely provided with an inserting piece; the first waterproof adhesive tape (2) is provided with an inserting groove and is connected with the fixing piece (1) through the inserting groove and the inserting piece, and the upper and lower sides of the novel composite panel stone materials (4) are provided with first grooves; the first waterproof adhesive tapes (2) are embedded in the first grooves, and the two adjacent novel composite panel stone materials (4) are connected and fixed by the first waterproof adhesive tapes (2). The bathroom wall stone installation structure for high-rise buildings provided by the utility model has the advantages that the installation time and the labor cost of ultra-large space bathroom stone wall are significantly reduced, the installation quality and efficiency are improved, the increasingly high demands of construction period, quality and cost control on the project are effectively met, and the best effects are realized.</description><subject>BUILDING</subject><subject>FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS</subject><subject>FIXED CONSTRUCTIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2014</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHBySizJKMrPz1UoT8zJUSguyc9LVcjMKy4B8hJLMvPzgEJFpcklpUWpCmn5RQoZmekZukWZxakKSaWZOSmZeenFPAysaYk5xam8UJqbQcnNNcTZQze1ID8-tbggMTk1L7Uk3tnPyMDY0sDU2Mw0NNSYKEUA9vczfw</recordid><startdate>20141029</startdate><enddate>20141029</enddate><creator>SONG HAO</creator><creator>YAN RUI</creator><creator>YANG ZIYUAN</creator><creator>LI HAIJUN</creator><creator>SHAO JIUDONG</creator><creator>DING NING</creator><creator>JI FANG'AN</creator><creator>MAO YUE</creator><creator>ZENG YANGHUI</creator><creator>XUE MINGHAO</creator><creator>ZHANG DONGYING</creator><creator>WANG JIAN</creator><creator>HAN SONG</creator><creator>TAN LEI</creator><creator>ZHANG YI</creator><creator>HUANG ZAIKUN</creator><creator>ZHANG ZIJIAN</creator><creator>XU WENYUAN</creator><creator>TIAN ZHUZHU</creator><scope>EVB</scope></search><sort><creationdate>20141029</creationdate><title>Bathroom wall stone installation structure for high-rise buildings</title><author>SONG HAO ; YAN RUI ; YANG ZIYUAN ; LI HAIJUN ; SHAO JIUDONG ; DING NING ; JI FANG'AN ; MAO YUE ; ZENG YANGHUI ; XUE MINGHAO ; ZHANG DONGYING ; WANG JIAN ; HAN SONG ; TAN LEI ; ZHANG YI ; HUANG ZAIKUN ; ZHANG ZIJIAN ; XU WENYUAN ; TIAN ZHUZHU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN203905365UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2014</creationdate><topic>BUILDING</topic><topic>FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS</topic><topic>FIXED CONSTRUCTIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>SONG HAO</creatorcontrib><creatorcontrib>YAN RUI</creatorcontrib><creatorcontrib>YANG ZIYUAN</creatorcontrib><creatorcontrib>LI HAIJUN</creatorcontrib><creatorcontrib>SHAO JIUDONG</creatorcontrib><creatorcontrib>DING NING</creatorcontrib><creatorcontrib>JI FANG'AN</creatorcontrib><creatorcontrib>MAO YUE</creatorcontrib><creatorcontrib>ZENG YANGHUI</creatorcontrib><creatorcontrib>XUE MINGHAO</creatorcontrib><creatorcontrib>ZHANG DONGYING</creatorcontrib><creatorcontrib>WANG JIAN</creatorcontrib><creatorcontrib>HAN SONG</creatorcontrib><creatorcontrib>TAN LEI</creatorcontrib><creatorcontrib>ZHANG YI</creatorcontrib><creatorcontrib>HUANG ZAIKUN</creatorcontrib><creatorcontrib>ZHANG ZIJIAN</creatorcontrib><creatorcontrib>XU WENYUAN</creatorcontrib><creatorcontrib>TIAN ZHUZHU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SONG HAO</au><au>YAN RUI</au><au>YANG ZIYUAN</au><au>LI HAIJUN</au><au>SHAO JIUDONG</au><au>DING NING</au><au>JI FANG'AN</au><au>MAO YUE</au><au>ZENG YANGHUI</au><au>XUE MINGHAO</au><au>ZHANG DONGYING</au><au>WANG JIAN</au><au>HAN SONG</au><au>TAN LEI</au><au>ZHANG YI</au><au>HUANG ZAIKUN</au><au>ZHANG ZIJIAN</au><au>XU WENYUAN</au><au>TIAN ZHUZHU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Bathroom wall stone installation structure for high-rise buildings</title><date>2014-10-29</date><risdate>2014</risdate><abstract>The utility model discloses a bathroom wall stone installation structure for high-rise buildings. The bathroom wall stone installation structure comprises a fixing piece (1), first waterproof adhesive tapes (2) and novel composite panel stone materials (4), wherein the fixing piece (1) is transversely and fixedly arranged on the wall, and the outer side of the fixing piece (1) is transversely provided with an inserting piece; the first waterproof adhesive tape (2) is provided with an inserting groove and is connected with the fixing piece (1) through the inserting groove and the inserting piece, and the upper and lower sides of the novel composite panel stone materials (4) are provided with first grooves; the first waterproof adhesive tapes (2) are embedded in the first grooves, and the two adjacent novel composite panel stone materials (4) are connected and fixed by the first waterproof adhesive tapes (2). The bathroom wall stone installation structure for high-rise buildings provided by the utility model has the advantages that the installation time and the labor cost of ultra-large space bathroom stone wall are significantly reduced, the installation quality and efficiency are improved, the increasingly high demands of construction period, quality and cost control on the project are effectively met, and the best effects are realized.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_CN203905365UU
source esp@cenet
subjects BUILDING
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
FIXED CONSTRUCTIONS
title Bathroom wall stone installation structure for high-rise buildings
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-26T19%3A53%3A56IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SONG%20HAO&rft.date=2014-10-29&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN203905365UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true