Bathroom wall stone installation structure for high-rise buildings

The utility model discloses a bathroom wall stone installation structure for high-rise buildings. The bathroom wall stone installation structure comprises a fixing piece (1), first waterproof adhesive tapes (2) and novel composite panel stone materials (4), wherein the fixing piece (1) is transverse...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SONG HAO, YAN RUI, YANG ZIYUAN, LI HAIJUN, SHAO JIUDONG, DING NING, JI FANG'AN, MAO YUE, ZENG YANGHUI, XUE MINGHAO, ZHANG DONGYING, WANG JIAN, HAN SONG, TAN LEI, ZHANG YI, HUANG ZAIKUN, ZHANG ZIJIAN, XU WENYUAN, TIAN ZHUZHU
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The utility model discloses a bathroom wall stone installation structure for high-rise buildings. The bathroom wall stone installation structure comprises a fixing piece (1), first waterproof adhesive tapes (2) and novel composite panel stone materials (4), wherein the fixing piece (1) is transversely and fixedly arranged on the wall, and the outer side of the fixing piece (1) is transversely provided with an inserting piece; the first waterproof adhesive tape (2) is provided with an inserting groove and is connected with the fixing piece (1) through the inserting groove and the inserting piece, and the upper and lower sides of the novel composite panel stone materials (4) are provided with first grooves; the first waterproof adhesive tapes (2) are embedded in the first grooves, and the two adjacent novel composite panel stone materials (4) are connected and fixed by the first waterproof adhesive tapes (2). The bathroom wall stone installation structure for high-rise buildings provided by the utility model has the advantages that the installation time and the labor cost of ultra-large space bathroom stone wall are significantly reduced, the installation quality and efficiency are improved, the increasingly high demands of construction period, quality and cost control on the project are effectively met, and the best effects are realized.