Cement pole overhead grounding wire elevator

The utility model relates to a cement pole overhead grounding wire elevator which comprises the components of: a rod head vertical iron hanging board, elevating frame slideways, a U-shaped elevating frame, an elevating lead screw, a force bearing base and a lead screw handle. Two elevating frame sli...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: JI HAISEN, ZHAO QUN, LU YAO, WANG LIPENG, DING GUANXI, ZHANG SEN, XUE LIMIN, LIU XIAOLI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The utility model relates to a cement pole overhead grounding wire elevator which comprises the components of: a rod head vertical iron hanging board, elevating frame slideways, a U-shaped elevating frame, an elevating lead screw, a force bearing base and a lead screw handle. Two elevating frame slidways are arranged. The bottom ends of the two elevating frame slideways are connected with the force bearing base. The U-shaped elevating frame is provided with holes. After top ends of the two elevating frame slideways penetrate the holes on the U-shaped elevating frame, the top ends of the two elevating frame slideways are movably connected with the rod head vertical iron hanging board. The middle part of the force bearing base is provided with a hole. After one end of the elevating lead screw passes through the hole of the force bearing base, the end of the elevating lead screw is connected with the U-shaped elevating frame through a bearing. The elevating lead screw is connected with the lead screw handle. One side of the force bearing base is provided with a rod body arc-shaped backplate. The cement pole overhead grounding wire elevator has functions of: realizing mounting operation on cement pole overhead grounding wire of traditional power transmission line by one person, reducing physical power consumption of the worker, and improving operation efficiency. The cement pole overhead grounding wire elevator effectively settles the problems of: low pulley hanging point, no enough overhead grounding wire elevation, and high mounting difficulty.