Using system and use of secondary battery
An electric power system effective for load leveling includes an electric power meter which measures the power that is charged from a generating facility into an electric power storing secondary battery via ac/dc converters, and also measures the discharged power that is supplied from the electric p...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | An electric power system effective for load leveling includes an electric power meter which measures the power that is charged from a generating facility into an electric power storing secondary battery via ac/dc converters, and also measures the discharged power that is supplied from the electric power storing secondary battery to a load via the ac/dc converters. A processing unit is provided which calculates a difference of an electric power fee from the quantity of charged power and quantity of discharged power measured by the electric power meter and respective unit prices of electric power, and then calculates the price for using the electric power storing secondary battery based on the electric power fee. The processing unit may be installed either on a manufacturer/lender's side or on an electric power consumer's side. |
---|