Roof reconstruction method and material transportation method for non-stop railway station house

The invention discloses a method for reconstructing a roof of a non-stop railway station house and a material transportation method, and the method for reconstructing the roof of the non-stop railway station house comprises the following steps: arranging a movement unit above a railway station roof...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG SHUAI, HUANG LEI, ZHANG SHENGLI, WANG PENG, HOU KANGDENG, DING HUI, SU WUMING, BAI JIAHUI, LIN XIAOYANG, JIANG GUANGLEI, LI ZHIMENG, WU XUEFENG, JING PENG, JI WENBIN, HUANG WEI, XU XIAOHUI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a method for reconstructing a roof of a non-stop railway station house and a material transportation method, and the method for reconstructing the roof of the non-stop railway station house comprises the following steps: arranging a movement unit above a railway station roof steel structure; a baffle plate structure is arranged on the motion unit; and the movement unit and the baffle plate structure are arranged in a way that the baffle plate structure can move under the driving of the movement unit so as to sequentially cover all different positions of the roof of the railway station. Therefore, when construction is carried out in severe weather such as wind blowing, rain, snow, hail and the like, the baffle plate structure can be driven to a construction area of the roof of the railway station house through the movement unit, rain and snow are prevented from entering a waiting room to affect waiting of passengers, normal construction is guaranteed, damage to construction materials du