Dynamic risk evaluation method for construction of subway station foundation pit beside existing building

The invention provides a dynamic risk evaluation method for construction of a subway station foundation pit beside an existing building, and belongs to the technical field of engineering tunnel construction risk evaluation. According to the method, a full-period dynamic risk factor identification an...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YANG CHAO, FANG YUFEI, CHAI JINFEI, YANG ZHIRAN, ZOU SHIZHUO, ZHOU YU, GAO YONGTAO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention provides a dynamic risk evaluation method for construction of a subway station foundation pit beside an existing building, and belongs to the technical field of engineering tunnel construction risk evaluation. According to the method, a full-period dynamic risk factor identification and safety evaluation system is constructed based on a spherical fuzzy number, a triangular fuzzy number and a sequence preference technology similar to an ideal solution, expert coefficients are used for measuring weights judged by different experts, and consistency of expert judgment is measured based on variable coefficients. According to the method, subjective judgment of experts and field objective data are combined, an evaluation system is constructed, professional terms are converted into a matrix form based on spherical fuzzy numbers and aggregated with objective data processed by triangular fuzzy numbers, and finally high-risk factors are identified and countermeasures are made through a sequence preference