Multi-station monthly scale runoff process random generation method
A multi-station monthly scale runoff process random generation method comprises the steps of determining n river sections needing to be simulated, obtaining monthly scale flow data of each section in m years, and constructing a sample data set; based on the sample data set, a # imgabs0 # dimension j...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A multi-station monthly scale runoff process random generation method comprises the steps of determining n river sections needing to be simulated, obtaining monthly scale flow data of each section in m years, and constructing a sample data set; based on the sample data set, a # imgabs0 # dimension joint distribution function of the monthly scale flow process of the n river sections is constructed, and a density function of joint distribution is a Gaussian mixture model; the monthly-scale flow process of n river sections is randomly generated by randomly sampling the joint distribution function, and the monthly-scale flow process of several years is randomly generated by sampling for several times. According to the method, stochastic simulation of the multi-station monthly scale runoff process can be realized, and compared with a multi-station runoff stochastic simulation master station method based on a seasonal regression model, the statistical characteristics, the self-correlation characteristics and the cr |
---|