Road construction project dynamic design proofreading optimization method and system and storage medium
The invention relates to the technical field of engineering management, and discloses a road construction project dynamic design proofreading optimization method and system and a storage medium, and the method comprises the steps: obtaining the position information of a construction region, and cons...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to the technical field of engineering management, and discloses a road construction project dynamic design proofreading optimization method and system and a storage medium, and the method comprises the steps: obtaining the position information of a construction region, and constructing a coordinate distribution diagram of the construction region. According to the method, the coordinate distribution diagram of the construction area is obtained in advance, the corresponding design drawing is constructed in the coordinate distribution diagram of the construction area according to the design information of the construction area, and then the design drawing is corrected according to the actual construction condition in the construction area, so that the design drawing of the construction area is continuously corrected; therefore, the finally corrected design drawing is consistent with the actual completion condition, the correction effect of the design drawing is ensured, and reference is pro |
---|