Arrangement method of ultrahigh steep slope gully debris protection structure

The invention discloses an arrangement method of an ultrahigh steep slope gully chipping protection structure, and belongs to the technical field of slope engineering governance. The arrangement method comprises intercepting and dredging nets arranged along the elevation of a gully, and buffering en...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: BAO WEI, KONG YUTIAN, ZHANG HEZUO, SUN WEI, CHEN ZHILIANG, LIN JINCHENG, YANG DONG, LIU KE, ZHANG HENG, WANG FANG, LONG YIBIN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses an arrangement method of an ultrahigh steep slope gully chipping protection structure, and belongs to the technical field of slope engineering governance. The arrangement method comprises intercepting and dredging nets arranged along the elevation of a gully, and buffering energy dissipation platforms and energy dissipation piles are arranged between the intercepting and dredging nets; the deslagging vertical shaft is arranged at the position of the buffering energy dissipation platform and the energy dissipation pile excavation side slope riding track along the same horizontal height, the deslagging tunnel is connected with the deslagging vertical shaft, the slag collecting structure is arranged at the bottom of the gully, the protective net is arranged on the excavation side slope riding track on the lower portion of the slag collecting structure, and the anti-collision wall is arranged at the slope toe. The ends, away from the slope, of the connecting beams are fixedly connected wit