Harbor basin road construction method, harbor basin road construction system and electronic equipment
The invention provides a harbor basin road construction method and system and electronic equipment, and the construction method comprises the following steps: S1, constructing a harbor basin and a flood prevention system, and filling a roadbed; s2, laying the gallery pavement at fixed distance; s3,...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention provides a harbor basin road construction method and system and electronic equipment, and the construction method comprises the following steps: S1, constructing a harbor basin and a flood prevention system, and filling a roadbed; s2, laying the gallery pavement at fixed distance; s3, burying a soil layer monitoring terminal at a fixed depth to monitor a sandy soil change state; s4, an isolation belt is built on the ground of the gallery; s5, the roadbed maintenance state is monitored, and if data abnormity occurs, an alarm is automatically given; and S6, repairing the roadbed. According to the technical scheme, the roadbed maintenance state is monitored in real time by laying the gallery pavement at a fixed distance and burying the monitoring terminal at a fixed depth, an alarm is automatically given if data abnormity is generated, a worker can trim the roadbed in time, construction can be carried out only by blocking the width of one lane at most in the construction and repair process, and the |
---|