TBM tunnel assembly cavern lining system and construction method
The invention relates to the technical field of underground tunnel supporting, and provides a TBM tunnel assembly cavern lining system and a construction method, and the TBM tunnel assembly cavern lining system comprises a primary supporting structure, a small-section concrete member, an arc-shaped...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to the technical field of underground tunnel supporting, and provides a TBM tunnel assembly cavern lining system and a construction method, and the TBM tunnel assembly cavern lining system comprises a primary supporting structure, a small-section concrete member, an arc-shaped concrete member and a soil and stone backfilling layer. The small-section concrete member is of an arc-shaped arch structure body, the inner diameter D1 of the small-section concrete member is larger than the cutter head diameter D2 of the TBM, and D1-D2 is larger than or equal to 8 cm and larger than or equal to 12 cm. The arc-shaped concrete member and the small-section concrete member are concentrically arranged, the arc-shaped concrete member is attached to the peripheral face of the top of the small-section concrete member, and in the vertical direction, the projection of the small-section concrete member on the ground is located in the projection of the arc-shaped concrete member on the ground; and a soil and |
---|