Water conservancy and hydropower engineering construction monitoring data management method and system
The invention relates to the technical field of construction supervision, in particular to a water conservancy and hydropower engineering construction monitoring data management method and system. The sequence feedback and auxiliary management module selects a corresponding rework section number seq...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to the technical field of construction supervision, in particular to a water conservancy and hydropower engineering construction monitoring data management method and system. The sequence feedback and auxiliary management module selects a corresponding rework section number sequence scheme when a corresponding rework risk interference influence demand value is maximum, and in combination with a rework intervention demand value corresponding to each element in a rework section number set, an optimal rework section number sequence of a water conservancy and hydropower project corresponding to the current time is screened; and the information is fed back to a corresponding water conservancy and hydropower engineering administrator for early warning to assist the administrator to make a rework decision. According to the method, the reworking condition of water conservancy and hydropower engineering during construction is considered, and the optimal reworking section number sequence of the wa |
---|