Water conservancy and hydropower engineering construction monitoring data management method and system

The invention relates to the technical field of construction supervision, in particular to a water conservancy and hydropower engineering construction monitoring data management method and system. The sequence feedback and auxiliary management module selects a corresponding rework section number seq...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LI JINHAN, CAO BO, YANG SHAOQIN, SONG JIE, HUANG GUOQIN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to the technical field of construction supervision, in particular to a water conservancy and hydropower engineering construction monitoring data management method and system. The sequence feedback and auxiliary management module selects a corresponding rework section number sequence scheme when a corresponding rework risk interference influence demand value is maximum, and in combination with a rework intervention demand value corresponding to each element in a rework section number set, an optimal rework section number sequence of a water conservancy and hydropower project corresponding to the current time is screened; and the information is fed back to a corresponding water conservancy and hydropower engineering administrator for early warning to assist the administrator to make a rework decision. According to the method, the reworking condition of water conservancy and hydropower engineering during construction is considered, and the optimal reworking section number sequence of the wa