Construction method for muddy water large shield to pass through metro depot with low influence
The invention relates to the technical field of shield construction, in particular to a construction method for a large-muddy-water shield to pass through a metro depot with low influence. The construction method comprises the following steps that S1, the integrity and the settlement degree of a str...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to the technical field of shield construction, in particular to a construction method for a large-muddy-water shield to pass through a metro depot with low influence. The construction method comprises the following steps that S1, the integrity and the settlement degree of a structure foundation are explored, and risk assessment of shield tunneling machine underneath pass construction is conducted; s2, reinforcing and repairing the structure foundation according to the evaluation result; s3, dividing a test section for underneath pass construction of the shield tunneling machine, collecting and analyzing parameters of settlement and structural stress change of a structure of the test section in the construction process, and determining a construction scheme of underneath pass construction of the shield tunneling machine according to an analysis result; s4, formal shield tunneling machine underneath pass construction is conducted according to the construction scheme of shield tunneling mac |
---|