Construction method for positioning and mounting pre-embedded anchoring parts of large aircraft high-speed test sliding rail

The invention discloses a construction method for positioning and installing a large aircraft high-speed test sliding rail embedded anchoring part. The construction method comprises the following steps: S1, positioning and installing an embedded sleeve: measuring and setting out an installation posi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YIN QIJIA, CHEN JINGRU, DENG XIAOYONG, LIU JIAN, ZHANG NING, HUANG YIWEI, LUO LIHONG, LUO BIN, WU YINGYE, HE PENG, WU YANBIN, DENG ZHENGWEN, WANG LEI, LYU MAOFENG, HU CHENG, ZENG DASHEN, YAO YUANSHUI, HE SASA, XU WEN, HE WEI, ZHU JIEBING, XU YI, LIU ZHOU, LI DONGHAI, ZHOU WEIKANG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a construction method for positioning and installing a large aircraft high-speed test sliding rail embedded anchoring part. The construction method comprises the following steps: S1, positioning and installing an embedded sleeve: measuring and setting out an installation position, planting steel bars for fixing, and grouting and pouring; s2, measuring and setting out; s3, brushing an interface agent; s4, assembling a combined part: combining and assembling the screw rod, the pre-embedded plate and a matched component, and placing in the pre-embedded sleeve; s5, the tool is in place, specifically, the tool is used for suspending the screw, and a measuring instrument is used for accurately adjusting the axis and the elevation of the tool; s6, assembly fine adjustment and positioning, specifically, the screws are finely adjusted one by one, and the perpendicularity of the screws and the flatness of the embedded plate are comprehensively rechecked; s7, fixing the pre-embedded plates, where