The invention relates to a construction method for hammering, ramming, guiding and drilling a hole in a steel pipe pile. The construction method comprises the following steps: vertically fixing the steel pipe pile at a designed position; a steel wire rope of a crawler crane penetrates through the st...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YE ZHIQIN, XU JIANGUO, CHEN XUBO, XU JIE, LUO SHUDONG, ZHOU NAIYUAN, MA GANG, CHEN YEGANG, YE HU, WANG SHIJIAN, SONG YUEJUN, XU ZIYAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator YE ZHIQIN
XU JIANGUO
CHEN XUBO
XU JIE
LUO SHUDONG
ZHOU NAIYUAN
MA GANG
CHEN YEGANG
YE HU
WANG SHIJIAN
SONG YUEJUN
XU ZIYAN
description The invention relates to a construction method for hammering, ramming, guiding and drilling a hole in a steel pipe pile. The construction method comprises the following steps: vertically fixing the steel pipe pile at a designed position; a steel wire rope of a crawler crane penetrates through the steel pipe end protection base and is connected with an impact heavy hammer through a percussion drill steel wire rope connector, then the impact heavy hammer is placed in the steel pipe pile, and the steel pipe end protection base falls to the upper end of the steel pipe pile and is clamped; the impact heavy hammer and the vibration hammer sequentially and circularly sink the steel pipe pile until the ballasts generated by tamping influence the tamping efficiency; a slurry box is connected with the steel pipe pile, a hole is formed in the upper portion of the joint of the steel pipe pile and the slurry box, high-pressure slurry is poured into the steel pipe pile, and the slurry drives rock ballast to flow into the s
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN118148126A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN118148126A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN118148126A3</originalsourceid><addsrcrecordid>eNqNjLEKAjEQRK-xEPUf1l6LqMi1EhQrK_sjJBMvsJcNSfx_o1hY2sy8B8PMO2iJpeanrUEiTaijOPKSaTTThBziY0O54QcYxjWgURjkcmB-m4mO7O-LeCoVYEohoQVj2c284YLVtxfd-nK-6-sWSQaUZCwi6qBvSvXq0Kvd8bT_Z_MCN4I_Mw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction method for hammering, ramming, leading hole drilling and construction of steel pipe pile</title><source>esp@cenet</source><creator>YE ZHIQIN ; XU JIANGUO ; CHEN XUBO ; XU JIE ; LUO SHUDONG ; ZHOU NAIYUAN ; MA GANG ; CHEN YEGANG ; YE HU ; WANG SHIJIAN ; SONG YUEJUN ; XU ZIYAN</creator><creatorcontrib>YE ZHIQIN ; XU JIANGUO ; CHEN XUBO ; XU JIE ; LUO SHUDONG ; ZHOU NAIYUAN ; MA GANG ; CHEN YEGANG ; YE HU ; WANG SHIJIAN ; SONG YUEJUN ; XU ZIYAN</creatorcontrib><description>The invention relates to a construction method for hammering, ramming, guiding and drilling a hole in a steel pipe pile. The construction method comprises the following steps: vertically fixing the steel pipe pile at a designed position; a steel wire rope of a crawler crane penetrates through the steel pipe end protection base and is connected with an impact heavy hammer through a percussion drill steel wire rope connector, then the impact heavy hammer is placed in the steel pipe pile, and the steel pipe end protection base falls to the upper end of the steel pipe pile and is clamped; the impact heavy hammer and the vibration hammer sequentially and circularly sink the steel pipe pile until the ballasts generated by tamping influence the tamping efficiency; a slurry box is connected with the steel pipe pile, a hole is formed in the upper portion of the joint of the steel pipe pile and the slurry box, high-pressure slurry is poured into the steel pipe pile, and the slurry drives rock ballast to flow into the s</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240607&amp;DB=EPODOC&amp;CC=CN&amp;NR=118148126A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,782,887,25573,76557</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240607&amp;DB=EPODOC&amp;CC=CN&amp;NR=118148126A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YE ZHIQIN</creatorcontrib><creatorcontrib>XU JIANGUO</creatorcontrib><creatorcontrib>CHEN XUBO</creatorcontrib><creatorcontrib>XU JIE</creatorcontrib><creatorcontrib>LUO SHUDONG</creatorcontrib><creatorcontrib>ZHOU NAIYUAN</creatorcontrib><creatorcontrib>MA GANG</creatorcontrib><creatorcontrib>CHEN YEGANG</creatorcontrib><creatorcontrib>YE HU</creatorcontrib><creatorcontrib>WANG SHIJIAN</creatorcontrib><creatorcontrib>SONG YUEJUN</creatorcontrib><creatorcontrib>XU ZIYAN</creatorcontrib><title>Construction method for hammering, ramming, leading hole drilling and construction of steel pipe pile</title><description>The invention relates to a construction method for hammering, ramming, guiding and drilling a hole in a steel pipe pile. The construction method comprises the following steps: vertically fixing the steel pipe pile at a designed position; a steel wire rope of a crawler crane penetrates through the steel pipe end protection base and is connected with an impact heavy hammer through a percussion drill steel wire rope connector, then the impact heavy hammer is placed in the steel pipe pile, and the steel pipe end protection base falls to the upper end of the steel pipe pile and is clamped; the impact heavy hammer and the vibration hammer sequentially and circularly sink the steel pipe pile until the ballasts generated by tamping influence the tamping efficiency; a slurry box is connected with the steel pipe pile, a hole is formed in the upper portion of the joint of the steel pipe pile and the slurry box, high-pressure slurry is poured into the steel pipe pile, and the slurry drives rock ballast to flow into the s</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjLEKAjEQRK-xEPUf1l6LqMi1EhQrK_sjJBMvsJcNSfx_o1hY2sy8B8PMO2iJpeanrUEiTaijOPKSaTTThBziY0O54QcYxjWgURjkcmB-m4mO7O-LeCoVYEohoQVj2c284YLVtxfd-nK-6-sWSQaUZCwi6qBvSvXq0Kvd8bT_Z_MCN4I_Mw</recordid><startdate>20240607</startdate><enddate>20240607</enddate><creator>YE ZHIQIN</creator><creator>XU JIANGUO</creator><creator>CHEN XUBO</creator><creator>XU JIE</creator><creator>LUO SHUDONG</creator><creator>ZHOU NAIYUAN</creator><creator>MA GANG</creator><creator>CHEN YEGANG</creator><creator>YE HU</creator><creator>WANG SHIJIAN</creator><creator>SONG YUEJUN</creator><creator>XU ZIYAN</creator><scope>EVB</scope></search><sort><creationdate>20240607</creationdate><title>Construction method for hammering, ramming, leading hole drilling and construction of steel pipe pile</title><author>YE ZHIQIN ; XU JIANGUO ; CHEN XUBO ; XU JIE ; LUO SHUDONG ; ZHOU NAIYUAN ; MA GANG ; CHEN YEGANG ; YE HU ; WANG SHIJIAN ; SONG YUEJUN ; XU ZIYAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN118148126A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>YE ZHIQIN</creatorcontrib><creatorcontrib>XU JIANGUO</creatorcontrib><creatorcontrib>CHEN XUBO</creatorcontrib><creatorcontrib>XU JIE</creatorcontrib><creatorcontrib>LUO SHUDONG</creatorcontrib><creatorcontrib>ZHOU NAIYUAN</creatorcontrib><creatorcontrib>MA GANG</creatorcontrib><creatorcontrib>CHEN YEGANG</creatorcontrib><creatorcontrib>YE HU</creatorcontrib><creatorcontrib>WANG SHIJIAN</creatorcontrib><creatorcontrib>SONG YUEJUN</creatorcontrib><creatorcontrib>XU ZIYAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YE ZHIQIN</au><au>XU JIANGUO</au><au>CHEN XUBO</au><au>XU JIE</au><au>LUO SHUDONG</au><au>ZHOU NAIYUAN</au><au>MA GANG</au><au>CHEN YEGANG</au><au>YE HU</au><au>WANG SHIJIAN</au><au>SONG YUEJUN</au><au>XU ZIYAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction method for hammering, ramming, leading hole drilling and construction of steel pipe pile</title><date>2024-06-07</date><risdate>2024</risdate><abstract>The invention relates to a construction method for hammering, ramming, guiding and drilling a hole in a steel pipe pile. The construction method comprises the following steps: vertically fixing the steel pipe pile at a designed position; a steel wire rope of a crawler crane penetrates through the steel pipe end protection base and is connected with an impact heavy hammer through a percussion drill steel wire rope connector, then the impact heavy hammer is placed in the steel pipe pile, and the steel pipe end protection base falls to the upper end of the steel pipe pile and is clamped; the impact heavy hammer and the vibration hammer sequentially and circularly sink the steel pipe pile until the ballasts generated by tamping influence the tamping efficiency; a slurry box is connected with the steel pipe pile, a hole is formed in the upper portion of the joint of the steel pipe pile and the slurry box, high-pressure slurry is poured into the steel pipe pile, and the slurry drives rock ballast to flow into the s</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN118148126A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Construction method for hammering, ramming, leading hole drilling and construction of steel pipe pile
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-03T12%3A21%3A20IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YE%20ZHIQIN&rft.date=2024-06-07&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN118148126A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true