Construction method for hammering, ramming, leading hole drilling and construction of steel pipe pile

The invention relates to a construction method for hammering, ramming, guiding and drilling a hole in a steel pipe pile. The construction method comprises the following steps: vertically fixing the steel pipe pile at a designed position; a steel wire rope of a crawler crane penetrates through the st...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YE ZHIQIN, XU JIANGUO, CHEN XUBO, XU JIE, LUO SHUDONG, ZHOU NAIYUAN, MA GANG, CHEN YEGANG, YE HU, WANG SHIJIAN, SONG YUEJUN, XU ZIYAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to a construction method for hammering, ramming, guiding and drilling a hole in a steel pipe pile. The construction method comprises the following steps: vertically fixing the steel pipe pile at a designed position; a steel wire rope of a crawler crane penetrates through the steel pipe end protection base and is connected with an impact heavy hammer through a percussion drill steel wire rope connector, then the impact heavy hammer is placed in the steel pipe pile, and the steel pipe end protection base falls to the upper end of the steel pipe pile and is clamped; the impact heavy hammer and the vibration hammer sequentially and circularly sink the steel pipe pile until the ballasts generated by tamping influence the tamping efficiency; a slurry box is connected with the steel pipe pile, a hole is formed in the upper portion of the joint of the steel pipe pile and the slurry box, high-pressure slurry is poured into the steel pipe pile, and the slurry drives rock ballast to flow into the s